Clear synth
Year:
2022Requirements of the client:
Design and build office and R&D labs for the Hyderabad branch with a Mezzanine floorProblems faced by the client:
For Existing space client required a mezzanine floorSolutions Offered:
Our Technical team examined the entire existing structure of the building and considered at the mezzanine floor as per the load-bearing capacity existing building and client requirementDuration of the project:
6 monthsClient:
Clear synthArea:
5000 sq. ft.Location:
HyderabadService:
Civil Interiors